CLF3 and 42209 power upgrade with 4M22 loaded limestone train from Rawlinna to Parkeston at Golden Ridge. In the consist behind 42209 is OPC381M 'Rawlinna'. 31st May, 2006. 2006-05-31 12:29:26 |
CLF3 and 42209 prepare to depart Loongana Lime's Parkeston plant with empty train 3M21 to Rawlinna. 30th May, 2006. 2006-05-30 09:45:29 |
Engines CLF3 and 42209 with 2 compressor cars arrive at Parkeston to shunt then run 3M21, Loongana Limestone train. 30th May, 2006. 2006-05-30 09:18:11 |
GM37 at Sandgate. 24th November, 2005. 2005-11-24 10:51:02 |
CLF3 and GM42 make their way back into Parkes yard after refuelling GM42. 17th November, 2005. 2005-11-17 16:47:05 |
CLF3 (failed) and GM42 (powering) lead the final ARG operated 4AS3 away from Condobolin Yard following a crew change. 17th November, 2005. 2005-11-17 12:37:42 |
GM38(AN) and 844(ARG) load grain with a Manildra service at Bribbaree. 16th November, 2005. 2005-11-16 11:08:02 |
GM43 leads CLF3 on 7SA3 at Fish River as they come to a stand due to a signal fault. 12 November, 2005. 2005-11-12 17:34:43 |